<bdo id="y1ziu"></bdo>

<samp id="y1ziu"><td id="y1ziu"></td></samp>

    1. <u id="y1ziu"></u>

          Welcome to the official website of Jiangsu Sanji Industrial Co., Ltd.!
          Jiangsu Sanji Industrial Co.,Ltd.

          National hotline:

          +86-523-88641502(Manager's office)

          +86-523-88641154(Sales)

          PRODUCTS

          Production capacity and production process of reduction device

          1. Catalyst production capacity

          Our company has a total of 8 sets of reduction devices, each package is filled with 2m 3 . It takes 3~4 days according to the general catalyst reduction process. It takes 1~3 days for passivation. Each set drives two sets and starts once every two days. For a period of 8 days, the minimum capacity is 2m 3 per day . If the process cycle is 4 days, the maximum capacity is 4m 3 per day .

          2. Catalyst reduction process

          1. Catalyst reduction production process

          2. Catalyst passivation production process

           

           

           

           

           

          < BACK >
          Jiangsu Sanji Industrial Co.,Ltd. I.D.:   @yuxinghg.com Jiangsu Sanji Industrial Co.,Ltd. P.W.:
          一本天堂v无码亚洲道久久_无码码男男作爱a片在线观看_亚洲av无一区二区三区_无码男男作爱a片在线观看
          <bdo id="y1ziu"></bdo>

          <samp id="y1ziu"><td id="y1ziu"></td></samp>

          1. <u id="y1ziu"></u>